Data center liquid cooling

Liquid Cooling Quick Disconnects

Define the interface. Review the complete connection.

Discuss UQD / UQDB and other liquid cooling connection requirements, from plug-and-socket selection to an approved alternative supply route.

UQD means Universal Quick Disconnect for hand-mated connections; UQDB means Universal Quick Disconnect Blind-Mate. Specify the required interface and counterpart. Supply availability and compatibility are confirmed for the selected pair.

Plug / SocketUQD / UQDB requirementsHose or threaded termination
Illustrative appearance of liquid cooling quick disconnects
Illustrative appearance. Final construction and components depend on the selected specification.

Specification review

Define what your system needs.

Share what is known. The remaining details can be confirmed during review.

Compatibility, performance and supply availability are confirmed for the selected connector pair and application. No blanket cross-brand interchangeability is implied.

ParameterWhat to specify
Interface & sizeRequired standard and revision, nominal flow size, plug / socket and mating component part number.
Connection styleHand-mated or blind-mate requirements, available space, alignment and mounting constraints.
Flow performanceTarget flow, coolant and temperature; available Cv data or pressure-drop curves for the selected connection.
Pressure & temperatureWorking and connection / disconnection conditions, including any pressure differential and temperature limits.
Wetted materials & sealsBody, valve and seal materials reviewed against the exact coolant formulation and concentration.
Disconnect performancePermitted spillage and air inclusion, shut-off requirements and acceptance test method.
Connection lifeRequired mating cycles and the corresponding operating and verification conditions.
End terminationHose attachment or thread standard, size, sealing method, dimensions and orientation.
Brand & compatibilityDesignated brands and part numbers, mating-pair requirements and evidence needed to approve an alternative.

Configuration & delivery

Review the conditions that matter.

01

Match both halves

Review the plug and socket as a pair. Similar appearance or nominal size alone is not sufficient to confirm interchangeability.

02

Review the fluid path

Consider the required flow and pressure-drop allowance alongside body materials, seals and the coolant formulation.

03

Qualify an alternative

Send the incumbent part numbers and fixed requirements. Define the compatibility evidence and sample checks needed for an approved second source.

Applications

Designed into the cooling loop.

01

Serviceable rack connections

Specify accessible, hand-mated connections together with the space needed for connection and disconnection.

02

Equipment & server interfaces

Match the connector envelope, flow allowance and coolant requirements of the equipment.

03

Blind-mate requirements

For UQDB or other blind-mate projects, share alignment, mounting, engagement and mating-interface details.

Review your mating parts as a pair.

Share the exact counterpart, applicable interface specification and revision, and your required compatibility evidence.

Before you specify

Common questions.

Start a conversation

Tell us which connection your system needs.

Send a drawing, a reference part or your initial requirements.

Helpful details: mating brand / part number, UQD or UQDB interface, plug / socket, coolant, target flow, pressure, temperature, termination and validation requirements.

Sample cost, lead time and supply details are confirmed after review.

Prefer email? sales@dongmancooling.com

Optional · PDF, PNG, JPG, XLSX or CSV · Up to 5 MB

Your information will be used to review and respond to this inquiry. Read our privacy notice.